Document the current arrangement
Review drawings, manuals, records, pump and filter details, watermaker operation, instruments and maintenance logs.
An independent review of the yacht’s water journey—from bunkering and production to final distribution—to identify risks, weak points and useful improvements.
Modern yacht freshwater systems combine multiple treatment stages, storage tanks, pumps, UV equipment, filters, distribution loops and monitoring instruments. Problems may arise from the interaction between stages rather than from a single defective component. A structured survey examines system layout, operating conditions, maintenance access, control philosophy, treatment sequence and crew procedures.
Who this is for: Owners’ representatives, captains, chief engineers, refit yards, project managers and technical managers considering upgrades or investigating recurring problems.

Review drawings, manuals, records, pump and filter details, watermaker operation, instruments and maintenance logs.
Assess bunkering and source water, filtration, water treatment, storage tank provisions, disinfection, distribution and outlet conditions.
Consider the suitability of sample points, flow paths, redundancy, access for service and the crew’s routine checks.
Separate urgent operational concerns from maintenance improvements, further tests and longer-term design recommendations.
Depending on scope: a clear technical survey report, observations by system stage, priorities for corrective action, sampling recommendations and an independent discussion of possible upgrade options. Drawings and specialist measurements can be added if agreed.
A yacht experiences repeated filter fouling shortly after bunkering. Instead of replacing all treatment equipment, the survey examines incoming sediment, pretreatment capacity, differential pressure, tank condition and the position of filters in the whole process.
Tell us the type of yacht, the water system arrangement and the concern. We will discuss an appropriate technical scope before any work begins.
Request a consultation →No. It is a technical review carried out to an agreed scope; it is not statutory certification.
A preliminary desk review is possible, but not all conditions can be assessed remotely. Onboard attendance may be recommended.
Yes. Early review of capacities, layout, access and treatment sequence can inform a separate refit or design-advisory assignment.
Service availability, physical attendance, analyses and deliverables depend on vessel location and agreed scope. No formal flag-state or statutory certification is implied.
Need vessel-specific advice? Send the details and receive a scope proposal before any paid consultancy begins.